Finished re-staging the layout. I will most likely perform a solo op session. Basically, I take each train and run through them myself over a period of about two weeks. I haven't worked the Stockdale Local since the N&W Meredosia Branch was added.
No construction reports tonight.
No comments:
Post a Comment