Last night a NCE UTP panel was install on the north end of Peoria.  I also moved the NCE booster.  I still need to clean up the wiring and zip tie everything at some point.  Tested the system to ensure all was still ok.

This morning, I installed one slide switch.  The first one is always the hardest.  I just need to get back into the groove so I can knock out the remaining 21 I need to do before the op session.

After that is complete, I should be ready for the massive clean-up operation.

I was happy to find a Rock Island #1 timetable (effective March 18th, 1979) which is the last one before the railroad shut down. 