Monday, April 18, 2016

The ROCK 3.0: Bad Airbrush Update

I received my repaired airbrush back from Badger over the weekend.  Jesus replaced the tip which was split and the needle bearing (little plastic piece).  So, hopefully, now, I'm good to go!  No cost except for the return shipping.


This week, I doubt I will be producing many paint shop reports.  We have guests coming to visit Saturday and they want to see the layout.  That means, I need to get moving on cleaning and organizing.  That has invoked the thought of operating though. I sent out a feeler email to a few folks.  I have two confirmed so far.  Two more and we can operate.  The projected date to operate in Saturday, June 4th.

I have a lot to do between now and then as I have some tricks up my sleeve.