Monday, September 20, 2010

Project Change Report 09.19.10

Another project change report was received down from management.

Car Dept Report:
After consulting two other railroads and numerous attempts to repair the fleet of silverside passenger cars, the decision was made this evening to sell off the equipment.  It was quite disappointing as the cars were great lookers, but the performance quality is well below standard.  The CEO has come to an agreement with management at the Peconic Railroad to purchase six Wheels of Time passenger cars to replace the silversides.  A test train was run on Saturday and the cars passed with flying colors.  Management was also very pleased with the cadillac-smooth performance of the E7A.  There was some operational issues over some of the turnouts due to the six-axle trucks.  Peconic shops reports that the wheel sets probably need to be adjusted for proper gauge plus the fact that the turnouts presently don't have proper controls to allow for a good solid throw.

As crews tested the passenger equipment, times were recorded between station stops.  Below is the new passenger schedule:

 CRIP Passenger Schedule v1


Below is a staging inbound/outbound report along with a typical operating session time line of events for four operators:

Staging Blocking OS Notes