I installed the four remaining slide switches in Rock Island completing all for this town. Cut and glued the CNW branchline from Davenport Yard to Hull, IL which is right before the line ducks under the ovalix.
It appears that I'm short one or two pieces of track. Either the Davenport industries on the CNW Branchline will be sacrificed or the end of the branchline which would prevent access to one grain elevator.
I ran out of prepared slide switches. This weekend I will work on preparing the 15 remaining ones for installation.
No comments:
Post a Comment