This morning before work, I added dry wall compound to the styrofoam in Rock Island. This was cut previously when we had our OSHA incident, but was never completed.
Added some bird shot weight to a few Atlas Rock Island 2-Bay covered hoppers that will be used in silica service.
I decided to turn on the system to ensure everything was kosher. My biggest fear is doing a lot of work on the layout and forgetting to test the system for shorts. There was a short this morning. I figured it was one of the tools on the layout. Removed all of them (there was quite a few). Short resolved. Thank goodness!
I found signs that our cat has been up on the second level of the layout. The culprit, a white furr ball acting as tumbleweed across the plowed fields of Ottawa. We will have to remedy that situation.
This evening, I worked on designing and constructing the new industries in Blue Island.
.
No comments:
Post a Comment