I installed more fascia finishing all but two short sections on the lower level (in the back corner). I have the corner and the top level along the backyard wall that needs to be completed. That should be fairly easy, but I need to save that for another day. I have more pressing items to tackle.
I cut and installed all of the DCC throttle jacks in the new section.
I then began the massive clean-up. I worked my butt off cleaning the room and not at a leisurely pace. I was cleaning at a high rate of speed. I'm wore slap out! I'm happy to report the room is 98% clean. I simply need to run the vacuum one more time over the entire room and it is complete. Wow! I'm beat!
Project update
8) start laying cork roadbed and track.
9) drop solder feeders
10) install slide switches
14) paint fascia board
15) introduce new and remove obsolete waybills
16) re-stage layout (majority is re-staged, but need to integrate the new industries and place cars in the new Ottawa yard, LaSalle and Bureau storage tracks).
17) schedule next op session!
.