Carrie Ave Shops has been busy working on the locomotive fleet.  Late this afternoon, they completed the last locomotive.  Clearing inspection, the locomotives were consisted and assigned a train for service.

A parking lot and road was created for the station at LaSalle, a new road crossing was added at Peoria, city streets and a neighborhood road were added at Bureau, and a small trailer park community was added at Bureau Junction.

Later in the evening, I went back and added some hillside in Peoria, Bureau Junction and Ottawa.  I also added an access road to the station and engine service facility at Ottawa.

Pre-Session Project update
1) Install slide switches
2) Re-stage the layout
3) Repair identified rolling stock that doesn't meet code 
(This is complete other than a few random cars that will be need more than a basic fix.  Those have been sent to the car shop for long term repairs).
4) Repair identified motive power that doesn't meet code
5) Construct Hennepin Canal bridge
6) Install LED Lights
7) Test all new trackage