No progress today, but I have been pondering some
construction issues that I will face soon.
Thanks to Allen in Nebraska for helping hash out some of these ideas.
Basic
Benchwork:
I will create 1x4 boxes supported by 2x4 legs. At Ottawa Yard, Ottawa Silica/LOF Peninsula and Utica I will use ½” plywood and build up hills and bluffs with Styrofoam.
I will create 1x4 boxes supported by 2x4 legs. At Ottawa Yard, Ottawa Silica/LOF Peninsula and Utica I will use ½” plywood and build up hills and bluffs with Styrofoam.
Between the aforementioned locations, I will have open
grid work with ½” plywood subroadbed supported on 1x4 risers.
I will connect the feeder wires to the bus wires using
suitcase connectors. I’ve heard about
these in the past and would like to try them this time. They are neater and involve less burning
flesh from soldering up above your head.
Rail height on the benchwork will be between 50"- 52". I'm 5'8" for reference.
Rail height on the benchwork will be between 50"- 52". I'm 5'8" for reference.
Trackwork:
I will use cork roadbed on the double track mainline
only. All yard and industrial track will
be glued direct to the subroadbed.
I will used Micro Engineering Code 55 Flex track along
with custom built turnouts using Atlas Code 55 rail.
I will handlay the gauntlet tracks for both
scale tracks at Ottawa Silica and Belrose Silica.
Dispatching/Operations
Signals will control the interlocking of the Rock Island
and Burlington Northern at Ottawa.
The mainline will be governed by Track Warrant
Control.
No comments:
Post a Comment