I took this time to cut the OSB table top for the open grid benchwork. I have all the pieces cut except for one 18" by 7.5' section. Hopefully, I can get the last section cut tomorrow.
I'm not installing them yet, as I need to cut out sections for the creek and any other scenery features I choose to highlight. I will need to lay out the track first before I can do that.
I did spend some time with my wife discussing options for the room including lighting, placing of frame railroad photos/artwork, placement and design of the family craft table/workbench and displaying various railroad memorabilia. I believe we have a great plan.
Immediate Future Goals:
- Complete OSB table top
- Pre-drill holes in open frame benchwork for bus wires and loconet cable
- Identify and cut the openings for the DCC throttle jacks
- Clean the room and start placing wire shelves under the layout for storage.
If I could finish this all up within the next week, I would be very happy.
No comments:
Post a Comment