Late last night, I cut the two tracks for box car loading at Libbey-Owens-Ford.
This evening, I cut the two tracks that server as the run around and scale tracks that run up through the middle of the Ottawa Silica Plant. I also cut the track that goes into the warehouse building at the south end of the plant. Foundry sand is loaded here into gons.
This completes everything for L-O-F and Ottawa Silica with two exceptions.
#1 I need another right hand turnout to complete the tracks that run behind the Ottawa Silica Plant
#2 I'm not happy with the gauntlet track I constructed. I'm going to take another stab at it before completing that section.
Moving on down the track, I glued four pieces of cork roadbed for the mainline past Ottawa Yard.
Photos of today's progress.
No comments:
Post a Comment