Monday, November 18, 2013

The ROCK 3.0: Progress Report 11.18.13

This morning, I installed the track between the crossover at Mill Street up through the turnout for Philadelphia Quartz (PQ).

After dinner, I cut and shaped the tracks for PQ.  Later this evening, I glued it all down.  It looks good and much like the prototype.  I'm absolutely thrilled so far with the ROCK rebuild.  Everything I have been studying is slowly starting to come together on the layout.  I'm very pleased!

No comments:

Post a Comment