Sunday, February 9, 2014

The ROCK 3.0: Progress Report 02.09.14

This evening, I installed the felt strips along the 1x4 underframe of the benchwork.  Nothing too exciting, but necessary for the layout skirting.  That wore my hands out.  My hands cramp up on tasks like that.

Later, I worked on testing the tracks by shoving cars in and out of industrial tracks with various types of locomotives.  I repaired the one damaged turnout point at LOF.  I dislike having to repair the points, but man ol' man do they cars just glide across those turnouts.  I tested all of LOF and the south end of Ottawa Silica.  All performed very well.  I'm quite pleased!  I can't wait to get the boys over here to operate!

No comments:

Post a Comment