Progress has been really infrequent lately. May is a busy month for us as school winds down and the summer activities ramp up.
Monday morning, I drilled the holes and placed the signals in place. This evening, I worked on wiring up two of the signal heads for Track #2 Eastbound at Utica. I added 22 gauge wire to the micro wires from the signal heads, ran wires to my homemade signal controller board, and then to the rotary switch. Everything worked perfectly. I'm very excited to see the signal lit. Now, to finish wiring up the remaining signal heads and mounting the panel.
I'll post photos once I have the signal bridge in place and all heads lit.
No comments:
Post a Comment