Sunday, February 6, 2011

Super Bowl Progress Report 02.06.11

During pre-game coverage, soldered feeder wires to 14 slide switches, wire leads to the tortoise for the west Bureau wye turnout, and wired the slide switch for the tortoise control. 

Constructed the Bader Ag office building and two fertilizer/seeds storage bins in Stockdale. 

No comments:

Post a Comment