Friday, May 6, 2011

Progress Report 05.06.11

This morning before work, I added a second coat of touch-up paint to the plastered wall holes.  I cut in the temporary track from the Peoria Branch to the mainline.  The track on the branchline is not glued, but will be used during the op session.  I have really enjoyed using MicroEngineering flex track for test purposes such as this.  A passenger train was run this morning to test the track plus time the route for a timetable adjustment.  Final track alignment will be installed after consulting with fellow layout owners.

I began the process of corralling the locomotives to place in their assigned consists on their trains. 

Since the station has been moved in Blue Island to the siding track at the IHB junction, a test train was run so we can adjust the timetable to allow for street running through Blue Island.

No comments:

Post a Comment