Welcome to the ROCK: 0 Days without an Accident

The ROCK's Engineering Department has been pulled off duty to process the stacks of OSHA paperwork due to the incident with a crew member yesterday.  Engineering is required to complete three days of safety training to avoid any issues in the future.  It is reported that the employee's wounds are healing ok.  The CEO hung the revised sign in the shop today.

In the meantime, the Track Gang commenced work preparing for slide switch installation.  They drilled 12 holes for slide switches, 2 holes for tortoise switch machines (for the Joliet crossover) and the throwbar holes in the all the slide switches.  Crews are expected to begin installation tomorrow.

.