Friday, August 31, 2012

Progress Report 08.30.12

After working on it for the last few days, the layout has been re-staged!  It was quite a project this first time around since the major renovations getting everything straight.  It typically doesn't take that long to re-stage.

I really need to continue the weathering of the freight cars.  The weathered cars look 100 times better than the non-weathered cars.

I think this weekend I will work on locomotive coupler heights and some scenery in the new section.  The locals are demanding new roads and infrastructure be built!

Pre-Session Project update
1) Install slide switches
2) Re-stage the layout
3) Repair identified rolling stock that doesn't meet code 
(This is complete other than a few random cars that will be need more than a basic fix.  Those have been sent to the car shop for long term repairs).
4) Repair identified motive power that doesn't meet code
5) Construct Hennepin Canal bridge
6) Install LED Lights
7) Test all new trackage 