Thursday, November 29, 2012

Progress Report 11.29.12 - Preparation for Operating

Worked on the layout this evening.  Sanded and painted the highway between Peru and LaSalle.

Cleaned up the workbench.  It was a hot mess.  Gathered up the variations of paperwork for the next op session.  Put away a bunch of locomotive projects and such that were laid out all across the layout.  Gathered up most of the tools in the layout room.

Fixed the temporary wiring connecting the upper level LED lights to the power supplies.  I had it connected with alligator clips.

Started to install a flexible rock retaining wall between Bureau and Peoria.  I have two sections completed, but will need to add the third section and then trim the excess.