I worked on the layout. I drilled the holes, ran the bus and loconet wires and installed six throttle jacks. I began cleaning the room, but quickly realized that the vacuum wasn't working well. I found another "cat" stuck in the back tube of the vacuum. Once I cleared the the massive hairball, we were good to go.
Tomorrow, I will start on clean-up duty. I'm really looking forward to getting the room cleaned up as it hasn't been fully since before layout 1.0 came down.
Complete OSB table topPre-drill holes in open frame benchwork for bus wires and loconet cableIdentify and cut the openings for the DCC throttle jacks- Clean the room and start placing wire shelves under the layout for storage.