Thursday, December 5, 2013

The ROCK 3.0: Progress Report 12.05.13

This evening, I installed the industrial tracks for Belrose Silica.  I'm really happy with the revised track configuration.

This completes all the industrial and mainline trackage for the layout.  The only area left to work on (track wise) is the yard at Ottawa.

I'll post pics this weekend.


No comments:

Post a Comment