Thursday, March 27, 2014

The ROCK 3.0: Progress Report 03.27.14

This evening, I worked on the layout for a little bit.  I repaired one set of turnout points that broke free today.

I moved the main mill plant building into place at Ottawa Silica.  I have the smaller garage type building also installed, but need to fill in the medium size building in between.

I then turned my focus to PQ.  I constructed the basic walls on two of the structures there.  I need to cut some PVC pipe sections for all the storage tanks they have on site.

The industries and railroad in general is looking really good with the basic scenery and structures going into place.  You can really sense what the vision of the layout is.

No comments:

Post a Comment