Progress Report 08.02.12

The CEO made a supply trip run to the hobby shop after work.

Returned to the layout.  Crews worked on the messy assignment first cutting and installing the remaining fascia for the layout.  Before this layout, I had never used fascia before.  It gives the layout such a finished look.  I'm quite pleased this is completed for the entire layout now.

Cleaned up the room (still have a fair number of items on the layout), moved all the power tools back down to the garage.

Took a break to handle some yard maintenance behind the fence.

Returned to the layout to find the track gang on site ready for work.  The crew installed the last leg of the Bureau wye, turnout, main and siding at Peoria.  I pulled up one additional section of track from the former RI Clinton Branch so I could make room for double track further back.  Glued down the roadbed, waited a bit and returned back to lay the final track.  Trackwork is complete!

Crews then performed the initial mudding of the joints of the fascia in preparation for paint.

Project update
1) complete benchwork for the Peoria branch
2) drill holes for the bus wire
3) run the bus wire
4) cut and re-install the workbench desk
5) clean off items stored on layout during construction

6) clean up the room
7) test NCE system to ensure no shorts before commencing trackwork
8) lay cork roadbed and track.
9) drop solder feeders
10) install slide switches
11) install car card boxes

12) run wire and install throttle jacks
13) install fascia board (majority complete - put off for another day)
14) paint fascia board
15) introduce new and remove obsolete waybills
16) re-stage layout (majority is re-staged, but need to integrate the new industries and place cars in the new Ottawa yard, LaSalle and Bureau storage tracks).

17) schedule next op session!
18) review all rolling stock making adjustments to couplers and/or wheels.




.