I guarantee a turnout point is going to break loose during the op session. If I expect it, I won't be stressed by it. I'll just make sure to be prepared. We'll make a prototypical situation out of it by calling out the track gang taking that turnout out of service for a while.
Flesh Burner (soldering iron), check....solder, check....
Later this evening, I worked on roads and base scenery with the plaster again.
- I added a driveway to the LOF workshop building beside the sand storage silos.
- Worked on the road that leads up to the LOF glass loading building.
- Constructed the driveway at Westclox.
- Built the small parking lot next to the water tower.
- Constructed the south access road to Ottawa Silica.
No comments:
Post a Comment