Thursday, September 25, 2014

The ROCK 3.0: Progress Report 09.25.14

There is much to do as it is less than 48 hours before the op session Saturday morning.  Here's a recap of tonight's flurry of activity.

Cleaned the house, went grocery shopping for lunch for the guys Saturday.

Today, I cut apart 32 road signs to add to the layout.  This evening, I painted the posts brown and the back of each sign silver (as they were all white).  Drilled the holes and installed all of them on the layout with my daughter's help..  I really like my signs.  It's a small detail, but looks great.  This layout is 100 times better than v1.0.  I'm really pleased with the level of detail and functionality.  I have no regrets in my decision to downsize and make everything better.






















Completed the fencing project around PQ.  It looks great!  I'm very pleased with how this plant is coming along.  Next, I want to add some bushes between the fence and the mainline.




Carrie Avenue Shops got the Soo Line GP35 #731 into service.  Tested and consisted with the sister #722 locomotive.




Cleaned all the locomotive wheels using a technique highlighted by my friend Ben Earp. Thanks for the tip Ben!


For Allen, check out the GP38-2s on assignment on the Ottawa Local on Saturday.    They look great!



Setup the construction scene on Mill Street.  I had a natural pot hole there form in the plaster.  I added the cracks to it and weathered previously.  Setup my construction crew and warning signs to complete the scene.





It was a wild night of activity, but I actually got everything on my To Do list for tonight completed.  I thought it was a pipe dream, but I set the bar high hoping for the best.  Tomorrow night will be more of the same.  Come Saturday evening, I'll be passed out on the sofa exhausted, but feeling accomplished.


Coming Soon!
New, updated video of the entire layout.
New, photo series of the entire layout staged and ready to go.


Wednesday, September 24, 2014

The ROCK 3.0: Progress Report 09.24.14

This evening, I worked on various things.  Cleaned off the workbench and put everything away out of site.  Painted the Train Cat tank loading platform black.  I worked on the fence around PQ's lot.  I managed to get over halfway completed.  Messed around with some motive power.  Put up the drop leaf staging yard, cleaned the tracks, tested everything.  All good.















Tuesday, September 23, 2014

The ROCK 3.0: Progress Report 09.23.14

Late, late last night, I repaired the skirting panels.  The fabric glue used to hold the velcro on had come loose at the ends of four of the panels.  I stapled those and re-installed.

I started working on the fencing project around PQ.

I also assigned the locomotives to each train and staged them.  The LaSalle staging yard trains are sitting out on the mainline behind Ottawa Yard.  The day of the op session, I will put up the drop leaf yard and back the trains to their operating starting positions.

So far, I'm making pretty good progress on my To Do list.  I might be able to get the second signal bridge installed at West Ottawa Yard before the op session.

This evening, I painted the area around PQ's lot and added the grass base coat.





Here are photos of some of the staged trains hanging out on the mainline until the drop leaf yard is in place.








Monday, September 22, 2014

The ROCK 3.0: Progress Report 09.22.14

No construction progress tonight, but I did clean all the track in preparation for the op session Saturday.  I love to see the shine on the rails.  I moved a bunch of cars around to clean the tracks.  Of course, I took my time doing so pulling cuts with locomotives.  I took about an hour or so to clean, but that was with me playing as I worked.

Sunday, September 21, 2014

The ROCK 3.0: Progress Report 09.21.14

With it being the last weekend before the op session, you would think I would be busy working on the layout.  Nope, that didn't happen.  I spent time with my family.  It's nearly at the point where I need to work on final preparations for the op session (cleaning track, cleaning up, cleaning loco wheels, etc).  This morning, I did vacuum the room.  The room is already picked up from my cleaning session last weekend, so I'm slightly ahead of the game currently.

Late on Sunday evening, I worked on another pre-session project.  I completed the second Train Cat tank car loading platform.  There is one more I need to construct for PQ, but is at a separate location from these.  I'm not the best at constructing these brass kits, but I do believe it looks good.  I need to paint them black now.












Thursday, September 18, 2014

The ROCK 3.0: Progress Report 09.18.14

Today, I cut and marked the red tabs for overweight cars at Belrose Silica and Ottawa Silica.


Earlier today, I cut apart all the pieces to construct the remaining two Train Cat tank car loading platforms.  That is half the battle with these brass kits.  

This evening, I touched up the paint on the fascia plus painted the drop leaf section.